
Gate Fab — Rangeville
Site-prep coordination
Wide IN-PROGRESS streetside shot of the Short Rangeville property frontage on a clear winter day with one of our team kneeling at the new besser-block pillar foundation, the bricklayer's red Zilch Waste Recycle skip bin in front of the existing sandstone-pillared entry, captured during the layout-coordination visit ahead of fabricating the new gate run.
- Type
- Action Shot
- Suburb
- Rangeville
- Job
- Gate Fab#116691
- Date
- 2025-08-12
More from this project

Want a result like this?
Get a quote on a new garage door, gate or repair from the Limitless team.

